Commercial Sewer Reline

The Problem

Trenchless rehabilitation of main sewer line under concrete slab in Retail Commercial Complex.

The Solution

The liner was laid out and loaded with epoxy resin, then blown through inverter machine to reline complete section of 150mm cast iron pipe, over a distance of some 50m.

The Result

The sewer pipe relining came in on time and on budget. Repairs were 100% effective.

Posted in Sewer Pipe Repairs